top of page
Search

St Brendan's College Yeppoon - LeBreton STEM Hub Complete

  • Tony Madden Architects
  • Nov 2, 2022
  • 1 min read

Construction has been completed for the new LeBreton STEM Hub at St Brendan’s College, Yeppoon.


The new facility is home to Science, Technology, Engineering and Maths (STEM) learning at the school, featuring wet & dry science labs, a large internal court, and a flexible learning area / lecture theatre.



The building connects into the existing LeBreton building through a new upper level walkway. The existing building has also been refurbished on the upper level to form 4 new classrooms with 2 shared breakout rooms.


 
 
 

Comments


contact us

Rockhampton Office: 3/171 Bolsover Street, Rockhampton

Brisbane Office: Lobby 1, Level 2, 76 Skyring Terrace, Newstead

t: (07) 4927 9700   e: admin@tmarchitects.com.au

© 2023 by Tony Madden Architects and created with Wix.com

bottom of page