top of page
Search

St Benedict's Stage 3 Construction Complete

  • Tony Madden Architects
  • Nov 2, 2022
  • 1 min read

Stage 3 of construction at St Benedict’s Catholic School in Townsville has recently been completed.


This stage has added a new library located in the heart of the school, a new learning block and an administration extension. The circular path around the new library completes the school’s central circulation, linking all classrooms to the library.


Watch the drone video below to see the new Stage 3 builds.

Video supplied by MBD Pty Ltd and produced by B&T Industries Pty Ltd.


Stage 4, commencing soon, is the final stage of the school’s master plan. This stage will feature a new Multi-purpose Building with a direct visual link through the main thoroughfare of the library.

Read more about Stage 4 and watch the proposed Walkthrough video here.

 
 
 

1 Comment


Pepko Akrapovik
Pepko Akrapovik
Jul 17

G’day mates! My brother's obsessed with anything Australian and told me about this place called https://crownslots-au.com/ crownslots after bragging about a lucky streak. I was skeptical—he’s the kind of guy who thinks two bucks is a big win. But when I logged in, the site was actually chill. The layout didn’t fry my eyes and the Aussie-themed bonuses were legit fun. I ended up hitting a combo on a platypus slot that nearly paid for my week’s groceries.

Like
contact us

Rockhampton Office: 3/171 Bolsover Street, Rockhampton

Brisbane Office: Lobby 1, Level 2, 76 Skyring Terrace, Newstead

t: (07) 4927 9700   e: admin@tmarchitects.com.au

© 2023 by Tony Madden Architects and created with Wix.com

bottom of page